CONSTITUENCY BRIEFING · ENERGYMAP.APP

Rawmarsh and Conisbrough

MP: John Healey (Labour) England Data to July 2026

Rawmarsh and Conisbrough has 2.2 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 800 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.8m across the constituency's 41,156 homes.

Ranks 329 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Swangate Project - Energy Storage SystemEconergy International Limited Battery 50 MW Approved 9 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref RB2017/1132
West Melton Electricity Substation - Energy Storage SystemBrampton Energy Storage Limited Battery 26 MW Approved 4 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref RB2022/0853
Firsby Lane, Hooton Roberts - Solar PanelsILOS Solar 14 MW4,900 homes Applied in 2026, still waiting for a decisionWho can move it: Rotherham Council · planning ref RB2026/0615
Meadows Road, Manvers - Solar ArrayHyperion Zero Limited Solar 2.1 MW800 homes Waiting 4.5 years for a planning decisionWho can move it: Rotherham Council · planning ref RB2022/0252
Brookfields Park, Brookfields Drive - Solar PV PanelsNext Distribution Limited Solar 1.1 MW400 homes Approved 2 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref RB2024/0617
Brookfields Park, Brookfields Drive - Solar PV PanelsNext Distribution Limited Solar 1.1 MW400 homes Approved 2 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref RB2024/0581

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Rawmarsh and Conisbrough 2.2 MW0 MWnot visible
Rother Valley 49 MW24 MWnot visible
Rotherham 0.5 MW2.6 MWnot visible
Doncaster Central 62 MW4.2 MWnot visible
Penistone and Stocksbridge 0 MW26 MWnot visible
Barnsley South 0.5 MW1.7 MWnot visible

Doncaster Central next door has 62 MW waiting, more than Rawmarsh and Conisbrough's 2.2 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.