CONSTITUENCY BRIEFING · ENERGYMAP.APP

Barnsley South

MP: Stephanie Peacock (Labour) England Data to July 2026

Barnsley South has 2 MW of renewables running, enough for 600 homes over a year, and nothing large waiting in the planning queue. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.3m across the constituency's 46,649 homes.

Ranks 481 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Houghton MainPeel Environmental EfW Incineration 20 MW Approved 11 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 2015/0137
Cranswick Convenience Foods, Valley Park Industrial Estate - Solar PanelsCranswick Convenience Foods Solar 2.2 MW800 homes Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 2025/1085

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Barnsley South 0.5 MW1.7 MWnot visible
Rawmarsh and Conisbrough 2.2 MW0 MWnot visible
Penistone and Stocksbridge 0 MW26 MWnot visible
Barnsley North 5.1 MW11 MWnot visible
Doncaster North 3.8 MW21 MWnot visible

Barnsley North next door has 5.1 MW waiting, more than Barnsley South's 0.5 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.