North West Cambridgeshire

MP: Sam Carling (Labour) England Data to July 2026

North West Cambridgeshire has 13 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 4,700 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £4.3m across the constituency's 46,790 homes.

Ranks 214 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Little Staughton Solar FarmNextpower SPV 12 Limited Solar 50 MW18,000 homes Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 22/01813/FUL
Haddon Solar parkWessex Solar Energy Solar 22 MW8,000 homes Refused by Huntingdonshire Council in 2024Who can move it: Huntingdonshire Council · planning ref 22/00668/FUL
Wittering Ford Road, Barnack - Solar Photovoltaic FarmLarkfleet limited Solar 11 MW4,000 homes Approved 3 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 23/00829/FUL
The Drove, Pondersbridge - Anaerobic Digestion PlantCollmart Growers Limited Anaerobic Digestion 6.8 MW Approved 3 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 22/01107/FUL

Plus 2 smaller projects — see the full seat page.

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
North West Cambridgeshire 13 MW20 MWnot visible
Huntingdon 32 MW157 MWnot visible
Corby and East Northamptonshire 52 MW5 MWnot visible
North East Cambridgeshire 2.9 MW156 MWnot visible
Peterborough 67 MW30 MWnot visible
South Holland and The Deepings 130 MW113 MWnot visible

South Holland and The Deepings next door has 130 MW waiting, more than North West Cambridgeshire's 13 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.