CONSTITUENCY BRIEFING · ENERGYMAP.APP
Macclesfield
Macclesfield has 1 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 400 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.0m across the constituency's 43,035 homes.
Ranks 418 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Macclesfield | 1 MW | 0 MW | not visible |
| Staffordshire Moorlands | 0.4 MW | 13 MW | not visible |
| Cheadle | 1.2 MW | 0 MW | not visible |
| High Peak | 0.3 MW | 0 MW | not visible |
| Hazel Grove | 0 MW | 0 MW | not visible |
| Congleton | 18 MW | 5.4 MW | not visible |
Congleton next door has 18 MW waiting, more than Macclesfield's 1 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.