CONSTITUENCY BRIEFING · ENERGYMAP.APP

Hazel Grove

MP: Lisa Smart (Liberal Democrat) England Data to July 2026

Hazel Grove has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.8m across the constituency's 41,074 homes.

Ranks 569 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Ashton Road, Bredbury - Battery Energy StorageCragside Energy Limited Battery 75 MW Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref DC/094002
Bredbury Substation - Battery Storage FacilityPrivate Developer Battery 50 MW Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref DC/082085
Goyt Hall Farm, Goyt Valley Footpath - Battery Energy StorageQueequeg Renewables Limited Battery 40 MW Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref DC/090340
Torkington Road, Hazel Grove - Solar PV PanelsConrad Energy (Developments) Limited Solar 30 MW11,000 homes Waiting 14 months for a planning decisionWho can move it: Stockport Council · planning ref DC/096042

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Hazel Grove 0 MW0 MWnot visible
Macclesfield 1 MW0 MWnot visible
Cheadle 1.2 MW0 MWnot visible
High Peak 0.3 MW0 MWnot visible
Stockport 1.2 MW0.3 MWnot visible
Gorton and Denton 0.5 MW1.9 MWnot visible

Cheadle next door has 1.2 MW waiting, more than Hazel Grove's 0 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call