CONSTITUENCY BRIEFING · ENERGYMAP.APP

Kensington and Bayswater

MP: Joe Powell (Labour) England Data to July 2026

Kensington and Bayswater has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £5.7m across the constituency's 62,466 homes.

Ranks 560 of 650 for clean power approved and not built.

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Kensington and Bayswater 0.2 MW0 MWnot visible
Chelsea and Fulham 0.8 MW0 MWnot visible
Hammersmith and Chiswick 0 MW0 MWnot visible
Ealing Central and Acton 0.4 MW0 MWnot visible
Cities of London and Westminster 2.3 MW0 MWnot visible
Queen's Park and Maida Vale 0.4 MW0 MWnot visible

Cities of London and Westminster next door has 2.3 MW waiting, more than Kensington and Bayswater's 0.2 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 1 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.