Ealing Central and Acton has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £5.0m across the constituency's 54,003 homes.
Ranks 511 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Ealing Central and Acton | 0.4 MW | 0 MW | not visible |
| Hammersmith and Chiswick | 0 MW | 0 MW | not visible |
| Ealing Southall | 0.2 MW | 0 MW | not visible |
| Ealing North | 0 MW | 0 MW | not visible |
| Kensington and Bayswater | 0.2 MW | 0 MW | not visible |
| Queen's Park and Maida Vale | 0.4 MW | 0 MW | not visible |
Ealing Central and Acton has more approved-and-waiting capacity than any of its neighbouring seats.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.