CONSTITUENCY BRIEFING · ENERGYMAP.APP
Cities of London and Westminster
Cities of London and Westminster has 2.3 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 800 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £5.4m across the constituency's 59,202 homes.
Ranks 325 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Pegasus House, Sackville Street - Roof Mounted Solar PanelsUnknown | Solar | 2.3 MW800 homes | Approved 5 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 21/07248/FULL |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Cities of London and Westminster | 2.3 MW | 0 MW | not visible |
| Chelsea and Fulham | 0.8 MW | 0 MW | not visible |
| Bermondsey and Old Southwark | 0.4 MW | 0 MW | not visible |
| Kensington and Bayswater | 0.2 MW | 0 MW | not visible |
| Poplar and Limehouse | 0.2 MW | 0 MW | not visible |
| Bethnal Green and Stepney | 0 MW | 0 MW | not visible |
Cities of London and Westminster has more approved-and-waiting capacity than any of its neighbouring seats.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- What building them would mean here — community payments, business rates and construction work
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 2 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.