CONSTITUENCY BRIEFING · ENERGYMAP.APP

Stockport

MP: Navendu Mishra (Labour) England Data to July 2026

Stockport has 1.2 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 400 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.3m across the constituency's 46,442 homes.

Ranks 394 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Welkin Mill, Welkin Road - Battery StorageNoriker Power Limited Battery 50 MW Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref DC/087394

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Stockport 1.2 MW0.3 MWnot visible
Cheadle 1.2 MW0 MWnot visible
Hazel Grove 0 MW0 MWnot visible
Gorton and Denton 0.5 MW1.9 MWnot visible
Manchester Withington 2.1 MW0 MWnot visible

Manchester Withington next door has 2.1 MW waiting, more than Stockport's 1.2 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 1 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.