CONSTITUENCY BRIEFING · ENERGYMAP.APP
Ealing North
Ealing North has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.2m across the constituency's 45,201 homes.
Ranks 569 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Ealing North | 0 MW | 0 MW | not visible |
| Hayes and Harlington | 1.6 MW | 0 MW | not visible |
| Ealing Southall | 0.2 MW | 0 MW | not visible |
| Ealing Central and Acton | 0.4 MW | 0 MW | not visible |
| Uxbridge and South Ruislip | 1.5 MW | 0 MW | not visible |
| Brent West | 0.9 MW | 0 MW | not visible |
Hayes and Harlington next door has 1.6 MW waiting, more than Ealing North's 0 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.