CONSTITUENCY BRIEFING · ENERGYMAP.APP
Bristol North East
Bristol North East has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.7m across the constituency's 40,025 homes.
Ranks 569 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Bristol North East | 0 MW | 0 MW | not visible |
| North East Somerset and Hanham | 0.5 MW | 5.2 MW | not visible |
| Bristol East | 0.3 MW | 0 MW | not visible |
| Bristol Central | 0 MW | 0 MW | not visible |
| Bristol North West | 5.6 MW | 43 MW | not visible |
| Filton and Bradley Stoke | 8.7 MW | 20 MW | not visible |
Filton and Bradley Stoke next door has 8.7 MW waiting, more than Bristol North East's 0 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.