CONSTITUENCY BRIEFING · ENERGYMAP.APP
Bristol East
Bristol East has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.2m across the constituency's 45,627 homes.
Ranks 520 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Philip Street Car BreakersConrad Energy | Battery | 7.2 MW | Approved 6 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 20/01888/F |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Bristol East | 0.3 MW | 0 MW | not visible |
| North East Somerset and Hanham | 0.5 MW | 5.2 MW | not visible |
| Bristol South | 1.7 MW | 0.2 MW | not visible |
| Bristol Central | 0 MW | 0 MW | not visible |
| Bristol North East | 0 MW | 0 MW | not visible |
Bristol South next door has 1.7 MW waiting, more than Bristol East's 0.3 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- What building them would mean here — community payments, business rates and construction work
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 2 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.