CONSTITUENCY BRIEFING · ENERGYMAP.APP
Blackley and Middleton South
Blackley and Middleton South has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.0m across the constituency's 43,754 homes.
Ranks 532 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Moston ValeNovus Renewable Services | Battery | 10 MW | Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref 127629/FO/2020 |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Blackley and Middleton South | 0.3 MW | 0.1 MW | not visible |
| Manchester Central | 2.9 MW | 4.1 MW | not visible |
| Oldham West, Chadderton and Royton | 2.8 MW | 0 MW | not visible |
| Heywood and Middleton North | 5.9 MW | 0 MW | not visible |
| Bury South | 0.4 MW | 0 MW | not visible |
Heywood and Middleton North next door has 5.9 MW waiting, more than Blackley and Middleton South's 0.3 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.