CONSTITUENCY BRIEFING · ENERGYMAP.APP

Blackley and Middleton South

MP: Graham Stringer (Labour) England Data to July 2026

Blackley and Middleton South has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.0m across the constituency's 43,754 homes.

Ranks 532 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Moston ValeNovus Renewable Services Battery 10 MW Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref 127629/FO/2020

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Blackley and Middleton South 0.3 MW0.1 MWnot visible
Manchester Central 2.9 MW4.1 MWnot visible
Oldham West, Chadderton and Royton 2.8 MW0 MWnot visible
Heywood and Middleton North 5.9 MW0 MWnot visible
Bury South 0.4 MW0 MWnot visible

Heywood and Middleton North next door has 5.9 MW waiting, more than Blackley and Middleton South's 0.3 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 1 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.