CONSTITUENCY BRIEFING · ENERGYMAP.APP

Wyre Forest

MP: Mark Garnier (Conservative) England Data to July 2026

Wyre Forest has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.2m across the constituency's 45,320 homes.

Ranks 429 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Kidderminster Energy and Resource ParkPower Generation Solutions EfW Incineration 5 MW Approved 5 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 20/000034/CM

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Wyre Forest 0.9 MW0 MWnot visible
Droitwich and Evesham 67 MW122 MWnot visible
Redditch 3.3 MW5.2 MWnot visible
Bromsgrove 51 MW0.7 MWnot visible
West Worcestershire 5.8 MW95 MWnot visible
South Shropshire 112 MW78 MWnot visible

South Shropshire next door has 112 MW waiting, more than Wyre Forest's 0.9 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 1 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.