CONSTITUENCY BRIEFING · ENERGYMAP.APP
Windsor
Windsor has 5 MW of renewables running, enough for 1,700 homes over a year, and nothing large waiting in the planning queue. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.9m across the constituency's 41,900 homes.
Ranks 465 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Galleymead House, Old Bath Road - Battery StoragePower & Energy Fields Limited | Battery | 2 MW | Refused by Slough Council in 2024Who can move it: Slough Council · planning ref P/10697/017 |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Windsor | 0.7 MW | 4.8 MW | not visible |
| Surrey Heath | 0 MW | 0 MW | not visible |
| Runnymede and Weybridge | 0.6 MW | 1.8 MW | not visible |
| Spelthorne | 0 MW | 0 MW | not visible |
| Maidenhead | 23 MW | 0.3 MW | not visible |
| Hayes and Harlington | 1.6 MW | 0 MW | not visible |
Maidenhead next door has 23 MW waiting, more than Windsor's 0.7 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 2 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.