CONSTITUENCY BRIEFING · ENERGYMAP.APP

Windsor

MP: Jack Rankin (Conservative) England Data to July 2026

Windsor has 5 MW of renewables running, enough for 1,700 homes over a year, and nothing large waiting in the planning queue. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.9m across the constituency's 41,900 homes.

Ranks 465 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Galleymead House, Old Bath Road - Battery StoragePower & Energy Fields Limited Battery 2 MW Refused by Slough Council in 2024Who can move it: Slough Council · planning ref P/10697/017

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Windsor 0.7 MW4.8 MWnot visible
Surrey Heath 0 MW0 MWnot visible
Runnymede and Weybridge 0.6 MW1.8 MWnot visible
Spelthorne 0 MW0 MWnot visible
Maidenhead 23 MW0.3 MWnot visible
Hayes and Harlington 1.6 MW0 MWnot visible

Maidenhead next door has 23 MW waiting, more than Windsor's 0.7 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.