CONSTITUENCY BRIEFING · ENERGYMAP.APP
Stalybridge and Hyde
Stalybridge and Hyde has 3 MW of renewables running, enough for 1,100 homes over a year, and nothing large waiting in the planning queue. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.9m across the constituency's 42,070 homes.
Ranks 537 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Printworks Road - Stalybridge Battery StorageZenobe Energy | Battery | 150 MW | Approved 3 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 23/00770/FUL |
| Tame Power - Flexible Energy FacilityAMP Energy Services Limited | Landfill Gas | 4.5 MW | Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 24/00916/FUL |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Stalybridge and Hyde | 0.2 MW | 3 MW | not visible |
| High Peak | 0.3 MW | 0 MW | not visible |
| Hazel Grove | 0 MW | 0 MW | not visible |
| Gorton and Denton | 0.5 MW | 1.9 MW | not visible |
| Ashton-under-Lyne | 0.9 MW | 0 MW | not visible |
| Oldham East and Saddleworth | 0.5 MW | 0 MW | not visible |
Ashton-under-Lyne next door has 0.9 MW waiting, more than Stalybridge and Hyde's 0.2 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- What building them would mean here — community payments, business rates and construction work
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 2 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call