CONSTITUENCY BRIEFING · ENERGYMAP.APP
Solihull West and Shirley
Solihull West and Shirley has 1.8 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 700 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.5m across the constituency's 38,043 homes.
Ranks 355 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Solihull West and Shirley | 1.8 MW | 0 MW | not visible |
| Stratford-on-Avon | 134 MW | 39 MW | not visible |
| Bromsgrove | 51 MW | 0.7 MW | not visible |
| Birmingham Selly Oak | 0 MW | 0 MW | not visible |
| Meriden and Solihull East | 1.9 MW | 0 MW | not visible |
| Birmingham Hall Green and Moseley | 2.1 MW | 0 MW | not visible |
Stratford-on-Avon next door has 134 MW waiting, more than Solihull West and Shirley's 1.8 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.