CONSTITUENCY BRIEFING · ENERGYMAP.APP

Ruislip, Northwood and Pinner

MP: David Simmonds (Conservative) England Data to July 2026

Ruislip, Northwood and Pinner has no large renewable or battery projects in the planning database. Its households still pay for Britain's grid bottlenecks: about £92 a year per household, £3.6m across the constituency's 38,683 homes.

Ranks 569 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
David Lloyd Leisure, Ducks Hill Road - Solar PanelsDavid Lloyd Leisure Limited Solar 1 MW400 homes Nothing published says what is holding this up · planning ref 272/APP/2023/1660

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Ruislip, Northwood and Pinner 0 MW0 MWnot visible
Uxbridge and South Ruislip 1.5 MW0 MWnot visible
Beaconsfield 0.4 MW0 MWnot visible
Harrow West 0 MW0 MWnot visible
Harrow East 0 MW0 MWnot visible
South West Hertfordshire 0.7 MW0 MWnot visible

Uxbridge and South Ruislip next door has 1.5 MW waiting, more than Ruislip, Northwood and Pinner's 0 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 1 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.