CONSTITUENCY BRIEFING · ENERGYMAP.APP
Ruislip, Northwood and Pinner
Ruislip, Northwood and Pinner has no large renewable or battery projects in the planning database. Its households still pay for Britain's grid bottlenecks: about £92 a year per household, £3.6m across the constituency's 38,683 homes.
Ranks 569 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| David Lloyd Leisure, Ducks Hill Road - Solar PanelsDavid Lloyd Leisure Limited | Solar | 1 MW400 homes | Nothing published says what is holding this up · planning ref 272/APP/2023/1660 |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Ruislip, Northwood and Pinner | 0 MW | 0 MW | not visible |
| Uxbridge and South Ruislip | 1.5 MW | 0 MW | not visible |
| Beaconsfield | 0.4 MW | 0 MW | not visible |
| Harrow West | 0 MW | 0 MW | not visible |
| Harrow East | 0 MW | 0 MW | not visible |
| South West Hertfordshire | 0.7 MW | 0 MW | not visible |
Uxbridge and South Ruislip next door has 1.5 MW waiting, more than Ruislip, Northwood and Pinner's 0 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.