CONSTITUENCY BRIEFING · ENERGYMAP.APP

Beaconsfield

MP: Joy Morrissey (Conservative) England Data to July 2026

Beaconsfield has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.6m across the constituency's 39,300 homes.

Ranks 506 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Pinstone Farm, Oxford Road - Battery Energy Storage SystemVoltwise Power Holdings Limited Battery 60 MW Waiting 12 months for a planning decisionWho can move it: Buckinghamshire Council · planning ref PL/25/2201/FA
Salters Lane - Solar PanelsGrupotec Solar Uk 9 Limited Solar 42 MW15,000 homes Waiting 13 months for a planning decisionWho can move it: Durham Council · planning ref DM/25/01801/FPA
Gerrards Cross Sewage Treatment WorksPeak Gen Power Battery 20 MW Waiting 5.6 years for a planning decisionWho can move it: Buckinghamshire Council · planning ref PL/20/4234/FA
Coldmoorholme Lane Battery StorageEnvirotech Energy Solutions Battery 7.2 MW Refused by Buckinghamshire Council in 2021Who can move it: Buckinghamshire Council · planning ref 20/08321/FUL

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Beaconsfield 0.4 MW0 MWnot visible
Windsor 0.7 MW4.8 MWnot visible
Maidenhead 23 MW0.3 MWnot visible
Hayes and Harlington 1.6 MW0 MWnot visible
Slough 1.2 MW0 MWnot visible
Wycombe 0.8 MW0 MWnot visible

Maidenhead next door has 23 MW waiting, more than Beaconsfield's 0.4 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.