Mid Leicestershire
Mid Leicestershire has 2.8 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 1,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £3.8m across the constituency's 41,841 homes.
Ranks 309 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Rothley Lodge, Loughborough Road - Solar PanelsSofidel UK Limited | Solar | 1.4 MW500 homes | Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref P/25/0178/2 |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Mid Leicestershire | 2.8 MW | 23 MW | not visible |
| Hinckley and Bosworth | 80 MW | 30 MW | not visible |
| South Leicestershire | 125 MW | 56 MW | not visible |
| Leicester West | 3.6 MW | 0.2 MW | not visible |
| Leicester East | 0.2 MW | 0 MW | not visible |
| Loughborough | 95 MW | 43 MW | not visible |
South Leicestershire next door has 125 MW waiting, more than Mid Leicestershire's 2.8 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- What building them would mean here — community payments, business rates and construction work
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 2 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.