CONSTITUENCY BRIEFING · ENERGYMAP.APP

Leicester West

MP: Liz Kendall (Labour) England Data to July 2026

Leicester West has 3.6 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 1,300 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.4m across the constituency's 47,499 homes.

Ranks 285 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Pepsico International Limited, Leycroft Road - Solar PanelsWalkers Snacks (Distribution) Limited Solar 3.2 MW1,200 homes Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref 20240078
Hoods Close - Solar PanelsTrelleborg Industrial AVS Solar 1.7 MW600 homes Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref 20230307
Sunningdale Road - Solar PanelsHarvest Green Developments Solar 1.6 MW600 homes Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 20251031

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Leicester West 3.6 MW0.2 MWnot visible
South Leicestershire 125 MW56 MWnot visible
Leicester South 0.3 MW0 MWnot visible
Leicester East 0.2 MW0 MWnot visible
Mid Leicestershire 2.8 MW23 MWnot visible

South Leicestershire next door has 125 MW waiting, more than Leicester West's 3.6 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.