CONSTITUENCY BRIEFING · ENERGYMAP.APP
Leeds Central and Headingley
Leeds Central and Headingley has 1.5 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 600 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.6m across the constituency's 39,577 homes.
Ranks 369 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Leeds Central and Headingley | 1.5 MW | 0.2 MW | not visible |
| Leeds South | 4.7 MW | 0.5 MW | not visible |
| Leeds East | 6.4 MW | 0 MW | not visible |
| Leeds West and Pudsey | 1.1 MW | 0 MW | not visible |
| Leeds North East | 0.6 MW | 0 MW | not visible |
| Leeds North West | 1.4 MW | 0 MW | not visible |
Leeds East next door has 6.4 MW waiting, more than Leeds Central and Headingley's 1.5 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.