Leeds North West has 1.4 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 500 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.7m across the constituency's 40,136 homes.
Ranks 384 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Leeds North West | 1.4 MW | 0 MW | not visible |
| Leeds West and Pudsey | 1.1 MW | 0 MW | not visible |
| Bradford East | 0.6 MW | 0.8 MW | not visible |
| Leeds Central and Headingley | 1.5 MW | 0.2 MW | not visible |
| Wetherby and Easingwold | 2.2 MW | 40 MW | not visible |
| Leeds North East | 0.6 MW | 0 MW | not visible |
Wetherby and Easingwold next door has 2.2 MW waiting, more than Leeds North West's 1.4 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.