 "pcon24cd": "E14001319",
 "name": "Leeds Central and Headingley",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 1.5,
  "stuck_mw_int": 2,
  "stuck_sites": 5,
  "homes_equivalent": 600,
  "homes_vs_seat_households": 0.01,
  "stuck_mw_12m_cut": 1.5,
  "consented_not_built_mw_any_age": 1.5,
  "operational_mw": 0.2,
  "operational_homes_equivalent": 100,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 1.5,
  "rank": 369,
  "tech_mix": {
   "solar": 1.5
  },
  "tech_summary": "all solar",
  "waiting_vs_running": null,
  "projects": [
   {
    "site_name": "Savins Mill Way, Kirkstall - Solar Panels",
    "address": "1 Savins Mill Way Kirkstall",
    "repd_ref_id": 16172,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.7,
    "homes_equivalent": 200,
    "consented": "2024-05-13",
    "months_waiting": 26.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Cardigan Fields Leisure Park, Cardigan Fields Road -Solar Panels",
    "address": "Cardigan Fields Leisure Park, 7 Cardigan Fields Road, Leeds",
    "repd_ref_id": 16571,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2024-07-10",
    "months_waiting": 24.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Headingley Carnegie Stadium, Kirkstall - Solar Panels",
    "address": "Headingley Carnegie Stadium, Kirkstall Lane, Kirkstall, Leeds",
    "repd_ref_id": 14668,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2023-09-08",
    "months_waiting": 34.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Hollywood Bowl",
    "address": "Hollywood Bowl, 3 Cardigan Fields Road, Leeds",
    "repd_ref_id": 7765,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2020-02-28",
    "months_waiting": 77.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Victoria Gate Leeds, George Street - Solar Panels",
    "address": "Victoria Gate, 44 Victoria Gate, George Street, Leeds",
    "repd_ref_id": 16090,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2024-04-30",
    "months_waiting": 27.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Leeds Dental Institute, The Worsley Medical - Solar Panels",
    "address": "Leeds Dental Institute, The Worsley Medical, Clarendon Way, Woodhouse, Leeds",
    "repd_ref_id": 20602,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2026-05-01",
    "months_waiting": 3.1,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 39577,
  "seat_total_gbp": 3600000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0,
  "building_mw": 0,
  "approved_mw": 0,
  "approved_24m_mw": 0,
  "refused_mw": 0,
  "submitted_mw": 0,
  "sites": []
 },
 "pipeline_projects": [],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001323",
  "E14001320",
  "E14001325",
  "E14001321",
  "E14001322"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}