CONSTITUENCY BRIEFING · ENERGYMAP.APP

Hastings and Rye

MP: Helena Dollimore (Labour (Co-op)) England Data to July 2026

Hastings and Rye has 1.2 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 400 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.3m across the constituency's 46,904 homes.

Ranks 400 of 650 for clean power approved and not built.

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Hastings and Rye 1.2 MW0 MWnot visible
Bexhill and Battle 1.9 MW16 MWnot visible
Folkestone and Hythe 1.1 MW81 MWnot visible
Weald of Kent 51 MW30 MWnot visible

Weald of Kent next door has 51 MW waiting, more than Hastings and Rye's 1.2 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 1 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.