CONSTITUENCY BRIEFING · ENERGYMAP.APP
Hastings and Rye
Hastings and Rye has 1.2 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 400 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.3m across the constituency's 46,904 homes.
Ranks 400 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Hastings and Rye | 1.2 MW | 0 MW | not visible |
| Bexhill and Battle | 1.9 MW | 16 MW | not visible |
| Folkestone and Hythe | 1.1 MW | 81 MW | not visible |
| Weald of Kent | 51 MW | 30 MW | not visible |
Weald of Kent next door has 51 MW waiting, more than Hastings and Rye's 1.2 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.