CONSTITUENCY BRIEFING · ENERGYMAP.APP

Bexhill and Battle

MP: Dr Kieran Mullan (Conservative) England Data to July 2026

Bexhill and Battle has 1.9 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 700 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.7m across the constituency's 40,145 homes.

Ranks 350 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Moor Hall Farm, Moor Hall Drive - Battery Energy Storage FacilityBalance Power Projects Limited Battery 400 MW Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref WD/2024/2957/MAJ
Eastlands Farm, Catsfield - Catsfield Battery Energy Storage FacilityMasdar Arlington Energy Battery 240 MW Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref RR/2024/1535/P
Pashley Farm, Ninfield Road - Battery Energy Storage SystemElgin Energy Esco Limited Battery 130 MW Waiting 14 months for a planning decisionWho can move it: Wealden Council · planning ref WD/2025/0500/MAJ
Catsfield Christmas Tree Farm, The Stream - Battery Energy Storage SystemElgin Energy Esco Limited Battery 100 MW Waiting 12 months for a planning decisionWho can move it: Rother Council · planning ref RR/2025/1284/P

Plus 1 smaller projects — see the full seat page.

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Bexhill and Battle 1.9 MW16 MWnot visible
Eastbourne 0.7 MW1.3 MWnot visible
Lewes 26 MW42 MWnot visible
Hastings and Rye 1.2 MW0 MWnot visible
Sussex Weald 1.1 MW16 MWnot visible
Tunbridge Wells 54 MW31 MWnot visible

Tunbridge Wells next door has 54 MW waiting, more than Bexhill and Battle's 1.9 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.