CONSTITUENCY BRIEFING · ENERGYMAP.APP
Hampstead and Highgate
Hampstead and Highgate has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.9m across the constituency's 53,041 homes.
Ranks 560 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Hampstead and Highgate | 0.2 MW | 0 MW | not visible |
| Cities of London and Westminster | 2.3 MW | 0 MW | not visible |
| Queen's Park and Maida Vale | 0.4 MW | 0 MW | not visible |
| Holborn and St Pancras | 0.2 MW | 0 MW | not visible |
| Islington North | 0 MW | 0 MW | not visible |
| Brent East | 13 MW | 0 MW | not visible |
Brent East next door has 13 MW waiting, more than Hampstead and Highgate's 0.2 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.