CONSTITUENCY BRIEFING · ENERGYMAP.APP
Islington North
Islington North has no large renewable or battery projects in the planning database. Its households still pay for Britain's grid bottlenecks: about £92 a year per household, £4.4m across the constituency's 48,197 homes.
Ranks 569 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Islington North | 0 MW | 0 MW | not visible |
| Holborn and St Pancras | 0.2 MW | 0 MW | not visible |
| Hackney South and Shoreditch | 0 MW | 0.2 MW | not visible |
| Islington South and Finsbury | 0.4 MW | 0 MW | not visible |
| Hampstead and Highgate | 0.2 MW | 0 MW | not visible |
| Hackney North and Stoke Newington | 0 MW | 0 MW | not visible |
Islington South and Finsbury next door has 0.4 MW waiting, more than Islington North's 0 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.