CONSTITUENCY BRIEFING · ENERGYMAP.APP
Glasgow West
Glasgow West has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.5m across the constituency's 48,825 homes.
Ranks 494 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Glasgow West | 0.5 MW | 0 MW | not visible |
| Glasgow North | 19 MW | 0 MW | not visible |
| Mid Dunbartonshire | 0 MW | 0.8 MW | not visible |
| West Dunbartonshire | 0.5 MW | 0 MW | not visible |
Glasgow North next door has 19 MW waiting, more than Glasgow West's 0.5 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.