CONSTITUENCY BRIEFING · ENERGYMAP.APP

Edinburgh East and Musselburgh

MP: Chris Murray (Labour) Scotland Data to July 2026

Edinburgh East and Musselburgh has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.9m across the constituency's 53,227 homes.

Ranks 540 of 650 for clean power approved and not built.

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Edinburgh East and Musselburgh 0.2 MW0.2 MWnot visible
Midlothian 4.2 MW0 MWnot visible
Edinburgh South West 0 MW0 MWnot visible
Edinburgh South 0 MW0 MWnot visible
Lothian East 0.4 MW216 MW£3.2m
Edinburgh North and Leith 0.2 MW0 MWnot visible

Midlothian next door has 4.2 MW waiting, more than Edinburgh East and Musselburgh's 0.2 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 1 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.