Edinburgh North and Leith
Edinburgh North and Leith has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £5.2m across the constituency's 56,682 homes.
Ranks 550 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Edinburgh North and Leith | 0.2 MW | 0 MW | not visible |
| Edinburgh South West | 0 MW | 0 MW | not visible |
| Edinburgh East and Musselburgh | 0.2 MW | 0.2 MW | not visible |
| Edinburgh West | 12 MW | 0.2 MW | not visible |
Edinburgh West next door has 12 MW waiting, more than Edinburgh North and Leith's 0.2 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.