CONSTITUENCY BRIEFING · ENERGYMAP.APP

Brent West

MP: Barry Gardiner (Labour) England Data to July 2026

Brent West has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.8m across the constituency's 41,163 homes.

Ranks 434 of 650 for clean power approved and not built.

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Brent West 0.9 MW0 MWnot visible
Ealing Central and Acton 0.4 MW0 MWnot visible
Ealing North 0 MW0 MWnot visible
Brent East 13 MW0 MWnot visible
Harrow West 0 MW0 MWnot visible
Harrow East 0 MW0 MWnot visible

Brent East next door has 13 MW waiting, more than Brent West's 0.9 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 1 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.