Coventry South

MP: Zarah Sultana (Your Party) England Data to July 2026

Coventry South has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.0m across the constituency's 43,462 homes.

Ranks 444 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Torrington Avenue Battery Storage FacilityPower Initiatives Limited Battery 30 MW Approved 2 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref PL/2024/0000114/FULM

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Coventry South 0.8 MW0 MWnot visible
Kenilworth and Southam 229 MW124 MWnot visible
Coventry East 1.5 MW0 MWnot visible
Meriden and Solihull East 1.9 MW0 MWnot visible
Coventry North West 0.2 MW0 MWnot visible
Rugby 77 MW25 MWnot visible

Kenilworth and Southam next door has 229 MW waiting, more than Coventry South's 0.8 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.