CONSTITUENCY BRIEFING · ENERGYMAP.APP
Coventry North West
Coventry North West has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.1m across the constituency's 44,299 homes.
Ranks 546 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Central Boulevard, Prologis Park - Solar PanelsPower Zero Limited | Solar | 1.6 MW600 homes | Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref PL/2025/0002182/PAPV |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Coventry North West | 0.2 MW | 0 MW | not visible |
| Coventry South | 0.8 MW | 0 MW | not visible |
| Coventry East | 1.5 MW | 0 MW | not visible |
| Meriden and Solihull East | 1.9 MW | 0 MW | not visible |
| North Warwickshire and Bedworth | 80 MW | 15 MW | not visible |
North Warwickshire and Bedworth next door has 80 MW waiting, more than Coventry North West's 0.2 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- What building them would mean here — community payments, business rates and construction work
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 2 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.