CONSTITUENCY BRIEFING · ENERGYMAP.APP

North Warwickshire and Bedworth

MP: Rachel Taylor (Labour) England Data to July 2026

North Warwickshire and Bedworth has 80 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 29,000 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.6m across the constituency's 39,472 homes.

Ranks 81 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Hams Hall - Battery Energy Storage SystemWelbar Energy Storage Limited / Penso Power (BW ESS) Battery 400 MW Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref PAP/2021/0473
Hams Hall, Hams Lane - Battery Energy Storage SystemEon UK Plc Battery 98 MW Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref PAP/2025/0227
Camp Farm, Knowle Hill - Battery StorageAmpyr Solar Europe Battery 50 MW Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref PAP/2024/0586
Marston Sewerage Pumping Station, Bodymoor Heath Lane - Battery StorageAnesco Limited Battery 50 MW Waiting 14 months for a planning decisionWho can move it: North Warwickshire Council · planning ref PAP/2025/0179
Lichfield Road, Watton Lane - Battery StorageAnglo ES Water Orton Limited Battery 50 MW Approved 2 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref PAP/2023/0056
Camp Farm, Knowle Hill - Solar FarmAmpyr Solar Europe Solar 50 MW18,000 homes Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref PAP/2024/0586
Park House Farm, Meriden Road - Solar FarmEnviromena Asset Management UK Limited Solar 48 MW17,000 homes Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref PAP/2023/0071
Mcdonnell Drive, Exhall - Battery Energy Storage SystemGreenfield Energy Developments Limited Battery 30 MW Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 41030
Park Lane, Astley - Solar PV FarmTor Energy Solar Limited Solar 30 MW11,000 homes Approved 4 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref PAP/2021/0651
Corley Smorral Lane - Photovoltaic Solar ArraysBarrs Family Enterprises Limited Solar 16 MW6,000 homes Approved 4 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref PAP/2021/0605
Vauls Farm, Astley Lane - Solar FarmIndustria Solar Bedworth Limited Solar 16 MW5,800 homes Approved 3 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref PAP/2022/0544
Hams Hall National Distribution ParkRolton Kilbride Advanced Conversion Technologies 14 MW Approved 9 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref NWB/16CM011

Plus 11 smaller projects — see the full seat page.

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
North Warwickshire and Bedworth 80 MW15 MWnot visible
Coventry East 1.5 MW0 MWnot visible
Meriden and Solihull East 1.9 MW0 MWnot visible
Coventry North West 0.2 MW0 MWnot visible
Nuneaton 1.6 MW5 MWnot visible
Hinckley and Bosworth 80 MW30 MWnot visible

North Warwickshire and Bedworth has more approved-and-waiting capacity than any of its neighbouring seats.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 3 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.