CONSTITUENCY BRIEFING · ENERGYMAP.APP

Coatbridge and Bellshill

MP: Frank McNally (Labour) Scotland Data to July 2026

Coatbridge and Bellshill has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.9m across the constituency's 42,252 homes.

Ranks 477 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Burnbank Street, Greenhill - Battery Storage FacilityRenewable Connections Developments Limited Battery 30 MW Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 24/00043/FUL
Coatbridge Material Recovery and Renewable Energy FacilityGolder Associates (UK) Ltd/ Shore Energy Advanced Conversion Technologies 25 MW Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref 09/00675/FUL

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Coatbridge and Bellshill 0.6 MW0.2 MWnot visible
Hamilton and Clyde Valley 2.1 MW61 MW£170k
Motherwell, Wishaw and Carluke 80 MW215 MW£2.4m
Rutherglen 1.5 MW0 MWnot visible
Glasgow East 0.5 MW0 MWnot visible
Airdrie and Shotts 24 MW82 MW£2.3m

Motherwell, Wishaw and Carluke next door has 80 MW waiting, more than Coatbridge and Bellshill's 0.6 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.