CONSTITUENCY BRIEFING · ENERGYMAP.APP
Bethnal Green and Stepney
Bethnal Green and Stepney has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.2m across the constituency's 46,156 homes.
Ranks 569 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Bethnal Green and Stepney | 0 MW | 0 MW | not visible |
| Poplar and Limehouse | 0.2 MW | 0 MW | not visible |
| Cities of London and Westminster | 2.3 MW | 0 MW | not visible |
| Hackney South and Shoreditch | 0 MW | 0.2 MW | not visible |
| Stratford and Bow | 0.5 MW | 0 MW | not visible |
Cities of London and Westminster next door has 2.3 MW waiting, more than Bethnal Green and Stepney's 0 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.