CONSTITUENCY BRIEFING · ENERGYMAP.APP

Chesham and Amersham

MP: Sarah Green (Liberal Democrat) England Data to July 2026

Chesham and Amersham has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.6m across the constituency's 39,259 homes.

Ranks 569 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Mop End Farm, Mop End Lane - Battery Energy StorageSandbrook Capital Bes Limited Battery 500 MW Applied in 2025, still waiting for a decisionWho can move it: Buckinghamshire Council · planning ref PL/25/2447/FA

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Chesham and Amersham 0 MW0 MWnot visible
Wycombe 0.8 MW0 MWnot visible
Mid Buckinghamshire 136 MW7.8 MWnot visible
Beaconsfield 0.4 MW0 MWnot visible
South West Hertfordshire 0.7 MW0 MWnot visible
Hemel Hempstead 2.8 MW0.3 MWnot visible

Mid Buckinghamshire next door has 136 MW waiting, more than Chesham and Amersham's 0 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.