CONSTITUENCY BRIEFING · ENERGYMAP.APP

Bolton South and Walkden

MP: Yasmin Qureshi (Labour) England Data to July 2026

Bolton South and Walkden has 3.6 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 1,300 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.3m across the constituency's 47,139 homes.

Ranks 286 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Stoneclough - Battery Energy StorageGAM Capital Limited / Infinis Energy Services Limited Battery 7 MW Approved 4 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 13256/22
Kenyon WayPrivate Developer Solar 1.9 MW700 homes Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref 20/74960/FUL
Edbro, Lever Street - Solar PanelsEdbro Plc Solar 1.7 MW600 homes Approved 3 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 15778/23

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Bolton South and Walkden 3.6 MW5 MWnot visible
Worsley and Eccles 0.4 MW0 MWnot visible
Leigh and Atherton 0 MW0.5 MWnot visible
Salford 0.6 MW0 MWnot visible
Bury South 0.4 MW0 MWnot visible
Bolton West 0.6 MW2.2 MWnot visible

Bolton South and Walkden has more approved-and-waiting capacity than any of its neighbouring seats.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.