CONSTITUENCY BRIEFING · ENERGYMAP.APP
Watford
Watford has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.9m across the constituency's 42,747 homes.
Ranks 494 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Watford | 0.5 MW | 0.3 MW | not visible |
| South West Hertfordshire | 0.7 MW | 0 MW | not visible |
| Hertsmere | 1.4 MW | 13 MW | not visible |
| St Albans | 1.9 MW | 0 MW | not visible |
St Albans next door has 1.9 MW waiting, more than Watford's 0.5 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.