CONSTITUENCY BRIEFING · ENERGYMAP.APP

Sheffield South East

MP: Mr Clive Betts (Labour) England Data to July 2026

Sheffield South East has 6.3 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 2,300 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.0m across the constituency's 43,974 homes.

Ranks 249 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Shepcote Lane - Solar Photovoltaic PanelsPeel Logistics Property Solar 4.3 MW1,600 homes Approved 3 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 23/01684/FUL
Clipper Logistics, Shepcote Lane - Solar PanelsLogicor Solar 1.1 MW400 homes Approved 4 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 22/04136/FUL
Sytner BMW Sheffield, Brightside Way - Solar PanelsSytner Group Limited Solar 1 MW400 homes Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 25/03219/PVPN

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Sheffield South East 6.3 MW0 MWnot visible
North East Derbyshire 50 MW9 MWnot visible
Sheffield Heeley 0 MW0 MWnot visible
Rother Valley 49 MW24 MWnot visible
Rotherham 0.5 MW2.6 MWnot visible
Sheffield Central 0.3 MW0 MWnot visible

North East Derbyshire next door has 50 MW waiting, more than Sheffield South East's 6.3 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.