CONSTITUENCY BRIEFING · ENERGYMAP.APP
Sheffield South East
Sheffield South East has 6.3 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 2,300 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.0m across the constituency's 43,974 homes.
Ranks 249 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Shepcote Lane - Solar Photovoltaic PanelsPeel Logistics Property | Solar | 4.3 MW1,600 homes | Approved 3 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 23/01684/FUL |
| Clipper Logistics, Shepcote Lane - Solar PanelsLogicor | Solar | 1.1 MW400 homes | Approved 4 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 22/04136/FUL |
| Sytner BMW Sheffield, Brightside Way - Solar PanelsSytner Group Limited | Solar | 1 MW400 homes | Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 25/03219/PVPN |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Sheffield South East | 6.3 MW | 0 MW | not visible |
| North East Derbyshire | 50 MW | 9 MW | not visible |
| Sheffield Heeley | 0 MW | 0 MW | not visible |
| Rother Valley | 49 MW | 24 MW | not visible |
| Rotherham | 0.5 MW | 2.6 MW | not visible |
| Sheffield Central | 0.3 MW | 0 MW | not visible |
North East Derbyshire next door has 50 MW waiting, more than Sheffield South East's 6.3 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- What building them would mean here — community payments, business rates and construction work
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 2 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.