Northampton South has 10 MW of renewables running, enough for 3,600 homes over a year, and nothing large waiting in the planning queue. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.0m across the constituency's 43,237 homes.
Ranks 428 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Sainsburys, Style Way - Solar PanelsSainsburys Supermarkets Limited | Solar | 4.5 MW1,600 homes | Applied in 2026, still waiting for a decisionWho can move it: West Northamptonshire Council · planning ref 2026/2336/PA |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Northampton South | 0.9 MW | 10 MW | not visible |
| South Northamptonshire | 104 MW | 85 MW | not visible |
| Northampton North | 0.5 MW | 0 MW | not visible |
| Daventry | 130 MW | 77 MW | not visible |
Daventry next door has 130 MW waiting, more than Northampton South's 0.9 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- What building them would mean here — community payments, business rates and construction work
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 2 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.