CONSTITUENCY BRIEFING · ENERGYMAP.APP
Keighley and Ilkley
Keighley and Ilkley has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.8m across the constituency's 41,851 homes.
Ranks 550 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Keighley and Ilkley | 0.2 MW | 0 MW | not visible |
| Calder Valley | 1.4 MW | 12 MW | not visible |
| Halifax | 0.2 MW | 18 MW | not visible |
| Shipley | 3 MW | 0 MW | not visible |
| Skipton and Ripon | 63 MW | 29 MW | not visible |
| Pendle and Clitheroe | 2.4 MW | 0 MW | not visible |
Skipton and Ripon next door has 63 MW waiting, more than Keighley and Ilkley's 0.2 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.