Halifax
Halifax has 18 MW of renewables running, enough for 16,000 homes over a year, and nothing large waiting in the planning queue. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £4.2m across the constituency's 45,628 homes.
Ranks 550 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Holmfield Battery StorageMasdar Arlington Energy | Battery | 500 MW | Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 24/01306/FUL |
| Stainland Road, Salterhebble - Battery Storage FacilityWhirlwind Energy Storage Limited | Battery | 25 MW | Approved 5 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 21/00839/FUL |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Halifax | 0.2 MW | 18 MW | not visible |
| Bradford South | 2 MW | 0 MW | not visible |
| Calder Valley | 1.4 MW | 12 MW | not visible |
| Bradford West | 2.3 MW | 0 MW | not visible |
| Shipley | 3 MW | 0 MW | not visible |
| Keighley and Ilkley | 0.2 MW | 0 MW | not visible |
Shipley next door has 3 MW waiting, more than Halifax's 0.2 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- What building them would mean here — community payments, business rates and construction work
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 2 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.