CONSTITUENCY BRIEFING · ENERGYMAP.APP
Halesowen
Halesowen has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.7m across the constituency's 39,813 homes.
Ranks 438 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Illeybrook Farm - Battery Energy StorageNet Zero Eleven Limited | Battery | 100 MW | Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref P23/0940 |
| Lowlands Farm - Battery StorageAnglo Renewables | Battery | 50 MW | Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref P22/1733 |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Halesowen | 0.9 MW | 0 MW | not visible |
| Bromsgrove | 51 MW | 0.7 MW | not visible |
| Birmingham Edgbaston | 0.8 MW | 0 MW | not visible |
| Stourbridge | 1.9 MW | 0 MW | not visible |
| Smethwick | 0.3 MW | 0 MW | not visible |
| West Bromwich | 3.4 MW | 1 MW | not visible |
Bromsgrove next door has 51 MW waiting, more than Halesowen's 0.9 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- What building them would mean here — community payments, business rates and construction work
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 2 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.