Feltham and Heston has 2.6 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 900 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.0m across the constituency's 43,662 homes.

Ranks 316 of 650 for clean power approved and not built.

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Feltham and Heston 2.6 MW1.7 MWnot visible
Spelthorne 0 MW0 MWnot visible
Twickenham 0 MW0 MWnot visible
Brentford and Isleworth 1 MW0 MWnot visible
Hayes and Harlington 1.6 MW0 MWnot visible
Ealing Southall 0.2 MW0 MWnot visible

Feltham and Heston has more approved-and-waiting capacity than any of its neighbouring seats.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 1 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.