CONSTITUENCY BRIEFING · ENERGYMAP.APP

Ellesmere Port and Bromborough

MP: Justin Madders (Labour) England Data to July 2026

Ellesmere Port and Bromborough has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.8m across the constituency's 41,649 homes.

Ranks 524 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Cheshire Power Station - Battery Storage FacilityRWE Generation UK Plc Battery 45 MW Approved 3 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 21/04501/FUL
Hooton ParkCogen Advanced Conversion Technologies 28 MW Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref APP/08/06316
Jaguar Landrover Phoenix Building, Eric Foundation Road - Solar ArrayJaguar Solar 1.3 MW500 homes Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 25/00515/P14

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Ellesmere Port and Bromborough 0.3 MW0.2 MWnot visible
Chester North and Neston 2.9 MW1.2 MWnot visible
Wirral West 0.2 MW0 MWnot visible
Birkenhead 1 MW0 MWnot visible
Runcorn and Helsby 0.7 MW51 MWnot visible

Chester North and Neston next door has 2.9 MW waiting, more than Ellesmere Port and Bromborough's 0.3 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.