CONSTITUENCY BRIEFING · ENERGYMAP.APP

Chester North and Neston

MP: Samantha Dixon (Labour) England Data to July 2026

Chester North and Neston has 2.9 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 1,100 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.8m across the constituency's 41,601 homes.

Ranks 302 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Mollington - Battery Energy StorageQair Renewables UK Limited Battery 240 MW Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 25/00132/FUL
Rectory Lane - Energy Storage SystemNet Zero Eighteen Limited Battery 200 MW Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 24/02219/FUL
Capenhurst Lane, Capenhurst - Battery StorageAura Power BESS Limited Battery 100 MW Approved 3 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref 22/03585/FUL
Capenhurst Lane, Capenhurst - Battery storageHD888CAP Limited Battery 57 MW Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref 21/02404/FUL
Land West Of Vicarage LaneSEP Puddington Solar 5 MW1,800 homes Waiting 11.2 years for a planning decisionWho can move it: Cheshire West and Chester Council · planning ref 15/01910/FUL

Plus 1 smaller projects — see the full seat page.

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Chester North and Neston 2.9 MW1.2 MWnot visible
Chester South and Eddisbury 19 MW30 MWnot visible
Alyn and Deeside 32 MW80 MWnot visible
Ellesmere Port and Bromborough 0.3 MW0.2 MWnot visible
Wirral West 0.2 MW0 MWnot visible
Runcorn and Helsby 0.7 MW51 MWnot visible

Alyn and Deeside next door has 32 MW waiting, more than Chester North and Neston's 2.9 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 2 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.