CONSTITUENCY BRIEFING · ENERGYMAP.APP
Edmonton and Winchmore Hill
Edmonton and Winchmore Hill has 1.2 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 400 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.2m across the constituency's 45,393 homes.
Ranks 398 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| North London Heat and Power (Edmonton EcoPark Replacement)North London Waste Authority (NLWA) | EfW Incineration | 70 MW | Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref EN010071 |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Edmonton and Winchmore Hill | 1.2 MW | 0.2 MW | not visible |
| Tottenham | 0 MW | 0 MW | not visible |
| Walthamstow | 0 MW | 0 MW | not visible |
| Chingford and Woodford Green | 0.2 MW | 0 MW | not visible |
| Southgate and Wood Green | 0 MW | 0 MW | not visible |
| Enfield North | 3.7 MW | 0 MW | not visible |
Enfield North next door has 3.7 MW waiting, more than Edmonton and Winchmore Hill's 1.2 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call