CONSTITUENCY BRIEFING · ENERGYMAP.APP
Chingford and Woodford Green
Chingford and Woodford Green has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.9m across the constituency's 42,518 homes.
Ranks 560 of 650 for clean power approved and not built.
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Chingford and Woodford Green | 0.2 MW | 0 MW | not visible |
| Leyton and Wanstead | 0 MW | 0 MW | not visible |
| Walthamstow | 0 MW | 0 MW | not visible |
| Ilford North | 0.2 MW | 0 MW | not visible |
| Edmonton and Winchmore Hill | 1.2 MW | 0.2 MW | not visible |
| Enfield North | 3.7 MW | 0 MW | not visible |
Enfield North next door has 3.7 MW waiting, more than Chingford and Woodford Green's 0.2 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.